Skip to content
Subscribe
Mortgage Tech Strategy

UAD 3.6 Is Live. Three Vendor Layers Decide Whether You Can Submit

UAD 3.6 Is Live. Three Vendor Layers Decide Whether You Can Submit
In short

UAD 3.6 became mandatory at UCDP on November 2. Here is how to check the three vendor layers that decide whether your appraisal submits.

UAD 3.6 became mandatory at the Uniform Collateral Data Portal on November 2, 2026. Appraisal reports first submitted on or after that date have to use the new format. A new UAD 2.6 submission now draws a Fatal message and a Not Successful status, per Fannie Mae. Warning messages on legacy files started back on August 6.

That is a submission failure, not a finding about the property.

The trigger is a submission date, nothing else

The date of first UCDP submission decides which format a file needs. The loan application date does not decide it. The order date does not decide it. The appraiser’s effective date does not decide it.

Revisions to a UAD 2.6 report first submitted before the deadline still go through. So a file ordered in October and submitted in October stays on the old track. A file ordered in October and submitted this week does not.

Three layers have to clear, not one

Readiness is not a single vendor answer. Three systems sit between your borrower and the portal.

The appraiser’s form software has to build a compliant 3.6 report. The appraisal management platform has to route, review and hold that report. The delivery connection, usually your LOS, has to push the ZIP into UCDP.

Your shop clears the mandate at the speed of the slowest of those three. A platform that accepts 3.6 cannot help when the appraiser on that county panel is on beta form software.

What the GSE lists actually record

Fannie Mae and Freddie Mac each publish a vendor list. Those lists are the closest thing to third party evidence a buyer gets.

Fannie Mae’s Integrated Vendor List carries separate entries for UCDP UAD 2.6 and UCDP UAD 3.6. It also carries a UAD 3.6 Appraisal Software Provider category and a UAD 3.6 Compliance Rules API category. Fannie Mae states plainly that a listing is not an endorsement. Freddie Mac points buyers to the same pair of lists.

The split between the 2.6 and 3.6 entries is the useful part. A vendor can sit on the list for the old format and not the new one.

A read of the Fannie Mae list on November 3 reached the letter B before the excerpt ended. Inside that stretch, ACI, a brand of First American Mortgage Solutions, appeared under UCDP UAD 3.6. Aivre, ApprAIz and Ascent Software Group (Jaro) appeared under the UAD 3.6 software and compliance categories. Appraisal.com, AIMSdashboard, Alexander McCabe and Appraisal Host appeared under 2.6 entries. The rest of the alphabet is unconfirmed from that read, so check your own vendors by name.

Form software is where the beta risk sits

At the form layer, published status varies by product. Class Valuation’s roundup records ACI Sky Workbench and Aivre as GSE verified. First American dated the ACI verification announcement June 8, 2026.

The same roundup records Appraise-It Pro in public beta, with the vendor calling its own future dates aspirational. NightHawk from Bradford Technologies is in active beta with group onboarding. TOTAL, from a la mode under Cotality, ships a Launch Edition that delivers 3.6 orders. Some pieces remain pending there, including sketch square footage automation and invoice creation.

Beta at the form layer shows up in your file as a revision cycle, not as a vendor problem. It costs cycle time first and pull-through later.

Platform and LOS claims, and what sits behind them

The platform layer is where vendor language gets confident.

Connexions states it is UCDP ready today. It runs both formats in one pipeline and cites both GSE lists. Reggora states it supports 3.6 across ordering, delivery and review. It keeps dual format ordering through the transition. Valutrust states it is ready to accept, process and fulfill 3.6 orders. It publishes no test result behind that claim.

ICE states the Encompass platform is ready. Its UCDP integration runs on Encompass Partner Connect and carries GSE approval. A UAD 2025 Indicator field requests the new format at order. The ZIP lands as a loan attachment.

ICE then writes the most useful sentence any vendor published on this. GSE approval confirms the connection exists, not that a lender’s own setup works. Take that sentence into every vendor call this month.

The exception buys a window, not a delay

You request a policy exception from each GSE you deliver to, and one grant does not cover the other.

Fannie Mae’s published windows run as follows, per reporting on the mandate. Approved lenders keep normal functionality through February 28, 2027. From March 1 to May 19, 2027 legacy files still move. Each one takes a Collateral Underwriter risk score of 999. Those loans also lose specified appraisal and value representation and warranty relief. From May 20, 2027 Fannie Mae accepts no new 2.6 reports.

Reggora records a parallel Freddie Mac effect, an LCA score of 99, and gives June 28, 2027 as full retirement. ICE dates the correction window for pre mandate 2.6 files at May 3, 2027.

March 1 is the date that should sit on your ops calendar. Losing value rep and warrant relief across a quarter of production is a repurchase exposure, not a workflow inconvenience.

Two more points worth holding. If you sell to an aggregator rather than to a GSE, your investor’s deadline governs. FHA has not set a required date at all. Under FHA INFO 2026-23 of October 1, 2026, lenders may keep delivering 2.6 through Electronic Appraisal Delivery. A single case has to stay on one format.

What to ask, and what counts as an answer

Ask your appraisal platform for the date of its first successful UAD 3.6 submission on a live file. A test submission is not that date.

Ask which GSE list the vendor appears on, and under which category. Ask the form software question separately, by panel and by county, because that answer differs from the platform answer. Ask what the review tool does when a 3.6 file arrives and the rule set still expects 2.6. Ask whether your exception request went in, to which GSE, and on what day.

What has not happened yet

No vendor published a confirmed day one submission notice that this run could verify. Readiness checklists are everywhere. A dated first successful live submission is the thing missing from all of them. Treat that absence as unconfirmed rather than as failure, and ask for the date yourself.

No vendor paid for a review. No mechanism exists to sell one. The site tracks 317 products, and 303 of them carry a published score.

Compare before you take the demo. Every tracked product is scored on one public rubric. Browse the side-by-side comparisons or read the scoring method.

Questions buyers ask

What exactly triggers the UAD 3.6 requirement on a loan?

The date the appraisal is first submitted to UCDP triggers it. The application date does not. The order date does not. The appraiser’s effective date does not. Revisions to a UAD 2.6 report first submitted before November 2, 2026 are still accepted.

Does a GSE policy exception give my shop more time?

It gives a defined window, not an extension. You request it from each GSE you deliver to, and one grant does not cover the other. Fannie Mae runs normal functionality through February 28, 2027. From March 1, 2027 those loans take a Collateral Underwriter risk score of 999. They also lose specified appraisal and value representation and warranty relief.

Does the mandate apply to FHA loans?

Not on November 2. Under FHA INFO 2026-23, issued October 1, 2026, approved lenders may use UAD 3.6 optionally. They may also keep submitting UAD 2.6 through FHA’s Electronic Appraisal Delivery portal. FHA has not announced a required use date. The format on a case must stay consistent.

Sources

  1. singlefamily.fanniemae.comFatal message and Not Successful status on new 2.6 files from 2026-11-02
  2. wrenews.comSubmission date trigger. Per GSE exception. Fannie windows at 2027-02-28, 2027-03-01 and 2027-05-20. CU score 999. Lost value rep and warrant relief. FHA optional under…
  3. singlefamily.fanniemae.comSeparate UCDP 2.6 and 3.6 categories. Listing is not endorsement. ACI shown under UCDP UAD 3.6. Aivre, ApprAIz and Ascent Software Group under 3.6 software categories….
  4. sf.freddiemac.comZIP required from 2026-11-02. Policy exception form. LCA risk score of 99. Software provider lists
  5. classvaluation.comForm software status. ACI Sky Workbench and Aivre verified. Appraise-It Pro in public beta. NightHawk in active beta. TOTAL Launch Edition with features pending
  6. aciweb.comBoth GSEs verified ACI Sky Workbench for UAD 3.6. Announced 2026-06-08
  7. mortgagetech.ice.comEncompass stated ready. UCDP integration on Encompass Partner Connect. UAD 2025 Indicator field. ZIP as loan attachment. Approval covers the connection, not a lender…
  8. reggora.comSupport across ordering, delivery and review. Dual format ordering. Freddie LCA 99 beside Fannie CU 999. Full 2.6 retirement 2027-06-28
  9. connexionssoftware.comStated UCDP ready today. Both formats in one pipeline. Cites both GSE lists
  10. valutrust.comStated ready to accept, process and fulfill 3.6 orders. Partner Connect migration dated 2026-12-31

Products covered in this piece

Jaro
Ascent Software Group
Cotality
Stone Point Capital and Insight Partners
Encompass
ICE Mortgage Technology
Reggora
Reggora, Inc., independent and venture-backed

More analysis

Nov 26, 2026 Mortgage Software Status Pages: What to Check Before You Sign Nov 24, 2026 Mortgage AI Subprocessors: Which Model Sits Under Your Vendor Nov 23, 2026 Fannie Mae Rental Income Rules: What Your LOS Must Calculate
Who stands behind this review

MortgageTechReview

This score rests on evidence anyone can check. It also rests on the vendor's own documentation, pricing, integration pages, and ownership records. We do not claim to run every product ourselves. Nobody can. The rubric was published before this review existed. The vendor did not write this, and no vendor can buy a word of it. Every product in this category is weighted the same way.

How this was scored · Who publishes this · Dispute this score · Disclosure

The Stack Memo · free · one email a month

One email a month: what's actually worth demoing.

New reviews, category shake-ups, pricing changes we've spotted. No vendor spam, unsubscribe anytime.

No vendor spam·We never sell your address·Unsubscribe in one click

Or read the buying guides →

317 products · 15 categories · one rubric

Every mortgage tool, scored the same way.

No pay-for-play, no vendor-written listicles, no gate. Start from the category you are actually buying in.

Compare →